You must be of legal drinking age to enter this site

Don't worry. Your search results will include similar terms and products to make finding your products easier and quicker.
Our Fast Order feature is a great tool that collates your most popular items and makes it easier to order them again.
05 February 2025 - Inn Express
Cask-conditioned beer is the gold standard for real ale enthusiasts. But what exactly is cask conditioning, and why does it make all the difference?
Cask conditioning is the natural fermentation process that takes place inside the cask after beer leaves the brewery. Unlike kegged or bottled beer, which is often pasteurised and force-carbonated, cask beer undergoes secondary fermentation in the cask, creating a fresher, more complex flavour profile.
The key steps in cask conditioning include:
Secondary Fermentation – The yeast continues to develop in the cask, naturally carbonating the beer.
Maturation & Settling – The beer is left to condition, allowing flavours to refine and sediment to settle.
Ventilation & Tapping – The cask is vented to release excess gas, then tapped for service.
Serving at Peak Freshness – The beer is served at its optimal quality, delivering a true pub-perfect pint.
To enjoy a pint at its best, proper cask management is crucial. Here’s a step-by-step guide:
Stillage the Cask – Position it correctly and allow it to settle before venting.
Clean the Shive & Keystone – Use warm water to maintain hygiene.
Vent the Cask – Insert a hard peg, slowly release gas, then remove the peg.
Tap the Cask – Use a clean, closed tap.
Conditioning – Leave the shive hole open for 24 hours, then insert a soft peg.
Sample for Quality – Check clarity, aroma, and taste.
Seal & Prepare for Service – Insert a hard peg until the beer is ready to serve.
Serve & Enjoy – Connect to the handpull, check for quality, and pour the perfect pint.
Roll & Position the Cask – If stored for over 24 hours, roll gently before venting.
Clean the Keystone – Ensure it’s dry and sanitised.
Tap the Cask – Use a clean, closed tap.
Conditioning – Leave the vent open for at least 48 hours.
Seal Until Ready – Close the vent and prepare for service.
Connect & Serve – Attach the cask to the line and check quality before serving.
12 Hours – Time required for beer to reach cellar temperature.
48 Hours – Minimum time needed for proper conditioning before serving.
10 Days – The maximum period before beer should be sold to maintain peak freshness.
Cask-conditioned beer offers a depth of flavour and freshness that simply cannot be replicated with other brewing methods. This craft ensures that every pint delivers the perfect balance of malt, hops, and natural carbonation.